About
Concrete is permanent.
So is our standard.
Highlands Concrete Constructions Pty Ltd has been a specialist concreting contractor since 2009, delivering superflat floors, structural, civil and architectural concrete across NSW. We are a family-owned and family-run company, and every pour we place carries our name.
Builders and developers bring us the work that leaves no room for error: tight tolerances, exposed finishes, difficult access, unforgiving programmes. Our reputation was built pour by pour. We stake it again on every slab.
Run from the slab,
not the office.
Highlands is led from the ground it builds on. Peter Gualtieri is a deeply experienced second-generation concreter with more than 35 years in the trade, and directs daily operations and the running of our sites. Daniel Venuto brings a strong commercial, operational and technical background, and drives the growth and direction of the business.
What is promised at tender is what is built on site.
Services
Superflat & Laser-Screed Floors
Floors placed by our own laser screeds, held to the tolerance the specification calls for. Warehouse racking, cold storage, VNA aisles and competition ice.
Structural Concrete
Suspended slabs, columns, cores and footings. Commercial, industrial and high-end residential structures built straight, level and on programme.
Concrete Pumping
Boom and line pumping. Difficult access, live sites and simultaneous multi-pump pours, placed where the reach is hardest.
Civil & External Works
Driveways, kerbing, retaining walls, hardstands and drainage infrastructure. Heavy-duty pavements built for decades of load.
Architectural Finishes
Off-form, polished, exposed-aggregate and burnished finishes. Where concrete stops being a material and becomes the design.
Formwork & Steel Fixing
Complete structural packages, with formwork and steel fixing coordinated under one contract. Conventional, jump and table-form systems built to millimetre tolerances.
Five steps.
One standard.
Quality control is not the last step. The work is checked against the specification while it is being placed, not only once it has set.
- TenderPriced from your drawings and programme by the people who will deliver the work.
- PlanningSequencing, access, labour and plant locked in before day one on site.
- PourPlaced to specification with our own plant on the job, from footings to full floor plates.
- FinishWorked to the finish the design calls for, and consistent across every element on the job.
- HandoverChecked against the specification and handed over on programme.
Projects
Competition Ice Rink & Sports Facilities
A competition ice surface begins with one of the flattest concrete floors in construction. We delivered this 1800 m² slab in one shot: a single continuous pour finished in 20 hours.

Large Industrial Warehouses
Full warehouse floor plates delivered wall to wall: placed, laser-screeded and burnished to a dense, reflective finish, ready for racking and hard-running traffic.

Data Centres
Structural concrete for a data centre: columns and heavily propped suspended decks, poured by boom pump and finished to the tolerances mission-critical floors demand.

Commercial Coolrooms
Coolroom and cold-store slabs placed and burnished inside the insulated envelope, finished dense and flat around penetrations, columns and panel walls.

Patterned External Finishes
External pavements finished in the snake pattern: sweeping hand-worked arcs that give large external slabs a slip-resistant surface with a signature look.

Education Precincts
Simultaneous multi-pump deck pours across a school campus. Pump, place and finish of all concrete elements, delivered around term-time constraints.

Mining Projects
Concrete placement for remote mine sites: off-road agitators feeding a placing boom, placing, screeding and finishing large-format slabs behind it.

Residential Apartments
Concrete structure for a multi-storey residential development: columns, cores and suspended decks placed and finished floor by floor as the building climbs.

Industrial Estates
Large-format warehouse floor slabs placed and levelled by laser screed. Flat, joint-minimised floors built for racking and forklift traffic from day one.

Multi-Level Carparks
Multi-level carpark structures from the ground up: columns, suspended trafficable decks, and the continuous curved ramp and edge walls that define them, poured off-form and repeated cleanly level over level. Work like this lives on cycle time, so every pour and finish is sequenced to land each deck on programme.
Plant & Fleet
Our own machines.
Our own standard.
Flatness, finish and programme stay in our hands because the plant is ours: Allen ride-on power trowels, Callaghan concrete boom pumping, and Somero laser screeds guided by 3D profiling.





